- Country: USA
- Summary: Design/Bid/Build - Area Maintenance Support Activity (Amsa) - San Tan Valley, Arizona
- UST Ref No: 101301342
- Deadline: 20 May 2024
- Competition: ICB
- Financier: Self Financed
- Purchaser Ownership: Public
- Tender Value: Refer Document
- Notice Type: Tender
- Document Ref. No.: W912QR24R0032
- Purchaser's Detail :
Purchaser : DEPT OF DEFENSE
Contracting Office Address : LOUISVILLE , KY 40202-2230
Primary Point of Contact : Ryan King
ryan.m.king2@usace.army.mil
Email :ryan.m.king2@usace.army.mil
- Description :
- Description
Request for Proposal (RFP) Solicitation number W912QR24R0032 is issued for the Design-Bid-Build construction of the Area Maintenance Support Activity (AMSA) located in San Tan Valley, Arizona. This is a Design/Bid/Build project for the construction of a 13,985 GSF facility that is comprised of six (6) 32x32 FT work bays, Storage Areas (Tool Room, Parts, Room, Fluid Distribution, Flammable Material Storage, Contaminated Waste Storage, Battery Room), Administrative Areas (Shop Office and Break Room), a Library, and a suite of Facility Support Spaces including Toilets/Lockers/Showers, Lactation/Wellness Room, and Mechanical/Electrical/ Telecom spaces. Supporting facilities include organizational and non-organizational parking, vehicle wash rack/platforms, a bi-level equipment loading ramp, storm drainage, paving, walks, curbs and gutters, fencing, gates, lighting, information systems, landscaping, signage, circulation pavements, and access roads on 20 acres of land acquired by a long-term, nominal-cost lease. Sustainability/Energy measures and Cybersecurity measures will be provided. Measures in accordance with the Department of Defense (DoD) Minimum Antiterrorism for Buildings standards are incorporated. Access for individuals with disabilities will be provided. Facilities will be designed in accordance with Unified Facilities Criteria (UFC) 4-171-05 and to a minimum life of 40 years in accordance with UFC 1-200-02, including energy efficiencies, building envelope and integrated building systems performance. Heating and air conditioning will be provided using self-contained systems. Contractor should be familiar with earthwork construction in local areas, masonry structures, structural steel, extension of underground utilities, and connection to existing underground utilities. Successful bidders shall be familiar with widely accepted and generally acknowledged successful practices for local construction.
The Contract Duration is estimated at 743 ca...
- Documents :
Tender Notice
W912QR24R0032-0001.pdf
Site-Visit-sign-in-sheet.pdf
W912QR24R0032_Specs_Vol3-0000.pdf
W912QR24R0032_Specs_Vol2-0000.pdf
W912QR24R0032_Specs_Vol1-0000.pdf
W912QR24R0032_Plans-0000.pdf
If you are registered member, kindly login to view full details of this tender notice:
CLICK HERE TO LOGIN