- Country: USA
- Summary: Defense Supply Center Richmond(Dscr) Building 3, Cylinder Shop, Exhaust System Install
- UST Ref No: 101304721
- Deadline: 24 Jun 2024
- Competition: ICB
- Financier: Self Financed
- Purchaser Ownership: Public
- Tender Value: Refer Document
- Notice Type: Tender
- Document Ref. No.: SP470324Q0039
- Purchaser's Detail :
Purchaser : DEPT OF DEFENSE
Contracting Office Address : RICHMOND , VA 23237
Primary Point of Contact : Robert Moragues, Contracting Officer
robert.moragues@dla.mil
Phone Number 8042795309
Fax Number 8042793246
Secondary Point of Contact : Kyle Gregory, Contracting Officer
Kyle.Gregory@dla.mil
Phone Number 8049806388
Email :robert.moragues@dla.mil
- Description :
- Description
Defense Supply Center Richmond(DSCR) Building 3 - Cylinder Shop Exhaust System Install
The objective of this project is to install a new exhaust system for the natural gas pressure washer at DSCR B3-Cylinder Shop.
A natural gas pressure washer has been installed in the cylinder washroom at the west end of B3 and needs an exhaust system installed so the pressure washer can be brought into service, for purposes of cleaning the cylinders, before being brought to the paint shop for refurbishing/painting.
The contractor shall provide certified, trained personnel with certifications in Natural Gas plumbing and ventilation/draft control. Contractor must follow all local codes and the National Fuel Gas Code (ANSI Z223.1 and NFPA No. 54).
The Contractor shall perform the following:
•Provide and install approximately 20 feet of new 12” diameter vertical double wall chimney vent made with a 304 stainless steel liner, insulation, and aluminized steel outer jacket.•Provide and install a 12” barometric draft diverter/inducer. Must be used and directly mounted to the stacking flange of the pressure washer.•Provide and install an U.L. approved rain cap on top of the chimney.•Provide a 12-14” diameter opening in the roof (wood, asphalt shingles) and 12-14” diameter opening in the sheetrock ceiling just below the roof in the cylinder washroom to fit the passage of the chimney vent.•Remove asphalt shingles where chimney will exit and save for reuse.•Provide and install roof flashing where chimney exits the roof and properly seal with approved roof sealant/caulk. Reuse the saved asphalt shingles to repair the roof once chimney is installed.•All penetrations below the outside roof need to be sealed with approved fire caulking to meet code.•Provide portable toilet for workers.•All construction material/waste must be removed/disposed of offsite.•Provide extension ladder and follow OSHA Fall Protection standard 1926.501 when working on the roof (10/12) ...
- Documents :
Tender Notice
Wage-Determination-VA20240017.pdf
DSCR-B3-Tab2-SOW-Exhaust-System-Installation.pdf
SP470324Q0039.pdf